SOLHAR Botswana – Stage Tank for Water Storage and to Pump Water

SOLHAR Botswana – Stage Tank for Water Storage and to Pump Water

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Botswana Stage Tank – Water Storage and Pump Project

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank

Grade B container purchase and delivered. Not in too bad of a shape.

Details about this Project;

THE CLIENT’S REQUEST:

Our client in Botswana requested us to come up with a solution for a stage tank to be able to store and pump water out of the pit area. Because of the depth of the pit, it is not feasible to pump water all the way up and out. The pumps required to do this is not cost effective. To be able to use smaller pumps the water needs to be pump in stages i.e. halfway up and then the last bit out of the pit area.

THE SOLUTION:

To achieve this, you need to be able to store large quantities of water before pumping it further.

We did some investigation and realized that is you reinforce and seal a container it will work perfectly.

 

 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

Our Solhar team started by strengthening the container frame from the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Container is boxed up and twice as rigid as before.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The original floor in containers are made from wood which needed to be removed and new floor installed made from sheet metal.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

To assist with the pressure of weight of 80000lt, we installed pipe supports on the inside of the container.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Access hatches were also fabricated for easy access for maintenance and repairs if needed.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Part of the request was to be able easily place the stage tank in new positions as required.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The easiest way to do this, was to build a sled on which it can be pulled.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Due to the size of the sled, it was assembled and welled in 2 halves.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Once welded they were joined together and,

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

The container was placed on top of the sled and welded in position.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

A water test showed some leaks, which was quickly repaired.

Considering it was a grade B container there was very little water lost.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06
VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

We applied a water resistance primer to the inside on the tank.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Nice inside paint job!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Same water-resistant primer was applied on the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Final paint applied to make the staged tank look brand new.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Loaded and on its way to its destination in Botswana. The tank worked so well that they ordered another on 3 months later.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding