KEW Foundries – Supplier performance evaluation for the period (July to December 2024)

KEW Foundries – Supplier performance evaluation for the period (July to December 2024)

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

KEW Foundries Performance Letter –

Suppliers of services and products

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Details about this Letter;

Kumar Anoop (Managing and Financial Director) Jeff Palin (Engineering Director), Jaime Goncalves (Operations Director). KIMBERLEY ENGINEERING WORKS (PTY) LTD Reg No. 1946/023622/07 Vat No. 4310114006. Private Bag X6062 Kimberley 8300 South Africa. 170 Phakamile Mabija Road KImberley.

Tel:+27 53 841 0474 Fax:+27 53 841 0473, e-mail: info@kewfoundries.co.za www.kewfoundries.co.za

SUPPLIER PERFORMANCE EVALUATION FOR THE PERIOD – JULY TO DECEMBER 2024

To : Solhar Cc Attention : Gerrard Booyens E-mail address : gerrard.booyens@solhar.co.za

Date : 20 June 2025

Dear Sir/Madam
Suppliers of services and products to KEW Foundries forms an integral part of our Quality Management System and
ability to meet the expectations of our customers. Supplier performance is measured based on the number of orders
placed on the supplier and the ability of the supplier to deliver goods or services as per the order.

This is measured by penalising the supplier for every order where a non-compliance was reported in terms of the following:
– On time delivery
– Product or Service Quality
– Documentation (Missing or incorrect)

It is expected from suppliers to achieve at least a rating of 85% unless otherwise advised.
Where a need has been identified for formal investigation and corrective action to address poor performance, KEW
Foundries will request it specifically by issuing a Non-conformance.

Please find below the overall rating for your company for the period July to December 2024 on the above criteria.
Should you have any questions regarding your rating, please contact me.
Your continued support and dedication is appreciated by the management of KEW Foundries.

Regards, Marius van Jaarsveld, Procurement Supervisor.

View some of our other projects completed by SOLHAR;

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

KEW Foundries – Supplier performance evaluation for the period (July to December 2024)

KEW Foundries – Supplier performance evaluation for the period (January to June 2024)

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

KEW Foundries Performance Letter –

Suppliers of services and products

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Details about this Letter;

Kumar Anoop (Managing and Financial Director) Jeff Palin (Engineering Director), Jaime Goncalves (Operations Director). KIMBERLEY ENGINEERING WORKS (PTY) LTD Reg No. 1946/023622/07 Vat No. 4310114006. Private Bag X6062 Kimberley 8300 South Africa. 170 Phakamile Mabija Road KImberley.

Tel:+27 53 841 0474 Fax:+27 53 841 0473, e-mail: info@kewfoundries.co.za www.kewfoundries.co.za

SUPPLIER PERFORMANCE EVALUATION FOR THE PERIOD – JANUARY TO JUNE 2024

To : Solhar Cc Attention : Gerrard Booyens E-mail address : gerrard.booyens@solhar.co.za

Date : 06 November 2024

Dear Sir/Madam Suppliers of services and products to KEW Foundries forms an integral part of our Quality Management System and ability to meet the expectations of our customers. Supplier performance is measured based on the number of orders placed on the supplier and the ability of the supplier to deliver goods or services as per the order.

This is measured by penalising the supplier for every order where a non-compliance was reported in terms of the following: – On time delivery – Product or Service Quality – Documentation (Missing or incorrect) It is expected from suppliers to achieve at least a rating of 85% unless otherwise advised.

Where a need has been identified for formal investigation and corrective action to address poor performance, KEW Foundries will request it specifically by issuing a Non-conformance. Please find below the overall rating for your company for the period January to June 2024 on the above criteria. Should you have any questions regarding your rating, please contact me. Your continued support and dedication is appreciated by the management of KEW Foundries.

Regards, Marius van Jaarsveld Procurement Supervisor

View some of our other projects completed by SOLHAR;

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

Dozer Blade Project – Removable Wear Liners done for Idwala Lime mine

Dozer Blade Project – Removable Wear Liners done for Idwala Lime mine

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Dozer Blade Project for Idwala Lime

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank
01 SOLHAR Botswana - Water Storage and Pump - Stage Tank

Dozer blade before modifications

Details about this Project;

THE CLIENT’S REQUEST:

IDWALA LIME requested us to assist with solution to help with dozer blade that wears away during work.

THE SOLUTION:

SOLHAR designed a removable wear liner to bolt on to the bottom of the dozer blade which can be removed and replaced easily within a day. 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

We have the capability to 3D scan the entire blade and transfer the measurements on to our drafting program.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Liners were designed and plasma cut to enable the client to bolt a new liner in place once the liner has worn down.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Plates which will be welded to bottom of blade were also designed.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Stiffener supports needed to be welded to the existing blade to make the complete assemble as strong and durable as possible.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Stiffener supports being assembled and welded to blade.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Once the stiffeners and backplate was part of the existing blade the liners were bolted on to complete the job.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Last of the liners being fastened.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Good coat of paint to make the dozer blade look brand as new.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03
VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02
VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

Finished product loaded and on its way back to the mine!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Back on the dozer and working perfectly. Client has ordered 2 more sets of liners to be installed when needed.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

SOLHAR Botswana – Stage Tank for Water Storage and to Pump Water

SOLHAR Botswana – Stage Tank for Water Storage and to Pump Water

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Botswana Stage Tank – Water Storage and Pump Project

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank

Grade B container purchase and delivered. Not in too bad of a shape.

Details about this Project;

THE CLIENT’S REQUEST:

Our client in Botswana requested us to come up with a solution for a stage tank to be able to store and pump water out of the pit area. Because of the depth of the pit, it is not feasible to pump water all the way up and out. The pumps required to do this is not cost effective. To be able to use smaller pumps the water needs to be pump in stages i.e. halfway up and then the last bit out of the pit area.

THE SOLUTION:

To achieve this, you need to be able to store large quantities of water before pumping it further.

We did some investigation and realized that is you reinforce and seal a container it will work perfectly.

 

 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

Our Solhar team started by strengthening the container frame from the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Container is boxed up and twice as rigid as before.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The original floor in containers are made from wood which needed to be removed and new floor installed made from sheet metal.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

To assist with the pressure of weight of 80000lt, we installed pipe supports on the inside of the container.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Access hatches were also fabricated for easy access for maintenance and repairs if needed.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Part of the request was to be able easily place the stage tank in new positions as required.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The easiest way to do this, was to build a sled on which it can be pulled.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Due to the size of the sled, it was assembled and welled in 2 halves.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Once welded they were joined together and,

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

The container was placed on top of the sled and welded in position.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

A water test showed some leaks, which was quickly repaired.

Considering it was a grade B container there was very little water lost.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06
VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

We applied a water resistance primer to the inside on the tank.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Nice inside paint job!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Same water-resistant primer was applied on the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Final paint applied to make the staged tank look brand new.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Loaded and on its way to its destination in Botswana. The tank worked so well that they ordered another on 3 months later.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

Wi-Fi Tower Installation at Vermeulens New Development by SOLHAR

Wi-Fi Tower Installation at Vermeulens New Development by SOLHAR

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Vermeulens New Development – Wi-Fi Tower Installation

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Details about this Project;

THE PROBLEM AND CLIENT’S REQUEST:

We were request by VERMEULENS and TRAMWAY / JENNEY INTERNET to install a WIFI tower on the new site.

Constraints that were facing us getting the right position and hight to be able to receive a strong signal. Problem is the best position was right in the path of the roadway for the delivery vehicles, we had to improvise to achieve the same result.

THE SOLUTION:

Decision was made to fix the WIFI tower to the side of the building out of the path of the delivery vehicles and in the best position possible.

 

 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

Fixing the first tower section and bracket to the side of the building.

We needed to clear the sheeting.

Nobody wants to fix sheeting!!!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

The brackets was welded to the outside column and anchored through the wall with treaded bar and back plates to ensure it will go nowhere.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The securing of the first section took time, but it was worth it.

It is the base that holds everything else upright.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Normally we install the tower sections with a jig, but due to the area and the complexity of the installation we decided it would be safer to use on of our cranes and assemble all the sections on the ground and lift it with on lift.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 05

Tightening the last bolts!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

Job done with quality. Job done safely! Happy client! We can ask for no more!

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

St Patrick’s CBC, Classroom Floor Replacement done in Kimberley

St Patrick’s CBC, Classroom Floor Replacement done in Kimberley

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

St. Patricks CBC in Kimberley – Classroom Floor Replacement

SOLHAR - Project Completed at CBC School in Kimberley (3)
SOLHAR - Project Completed at CBC School in Kimberley (3)

Details about this Project;

REASON FOR REPLACEMENT OF CLASSROOM FLOOR:

Water damage is protruding from underneath.

OUR SOLUTION/REPAIR APPROACH: 

  1. Remove the existing 100mm concrete floor.
  2. Replace with 25Mpa concrete floor containing
    • Fuge B : A pore blocking water proofer which binds with the lime in cement to form water repellent particles.
    • Fibrin XT : A monofilament polypropylene fibre, providing sufficient strength and contributes to water reduced permeability, making it strong, water proof and cost effective.
  3. Cut of expansion joint 24hr after placement.

TIP: How to fix a water damaged concrete floor?

Restoring Concrete After Water Damage – If you have wet concrete in your home or office, follow these steps for repair:


Remove standing water. The drying process for wet concrete begins with the removal of all standing water.

Dehumidify the space.

After removing the standing water, the next step is to dehumidify the space.

Create air movement.

SOLHAR - Project Completed at CBC School in Kimberley (4)
SOLHAR - Project Completed at CBC School in Kimberley (5)

We at Solhar Civils stive to incorporate new ideas into everyday challenges. We were privileged to be consulted by CBC school in Kimberley to assist in solving the manner of constant wet classroom floor.

Solhar Civils is extremely proud to assist in the upgrade of the infrastructure at CBC and continue to strive for developing relationships with the local business community.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

JOHAN LE ROUX - Civil Engineering
072 672 7427
johan.leroux@solhar.co.za

CONTACT US;

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding