SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Botswana Stage Tank – Water Storage and Pump Project

01 SOLHAR Botswana - Water Storage and Pump - Stage Tank

Grade B container purchase and delivered. Not in too bad of a shape.

Details about this Project;

THE CLIENT’S REQUEST:

Our client in Botswana requested us to come up with a solution for a stage tank to be able to store and pump water out of the pit area. Because of the depth of the pit, it is not feasible to pump water all the way up and out. The pumps required to do this is not cost effective. To be able to use smaller pumps the water needs to be pump in stages i.e. halfway up and then the last bit out of the pit area.

THE SOLUTION:

To achieve this, you need to be able to store large quantities of water before pumping it further.

We did some investigation and realized that is you reinforce and seal a container it will work perfectly.

 

 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

Our Solhar team started by strengthening the container frame from the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Container is boxed up and twice as rigid as before.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The original floor in containers are made from wood which needed to be removed and new floor installed made from sheet metal.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

To assist with the pressure of weight of 80000lt, we installed pipe supports on the inside of the container.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Access hatches were also fabricated for easy access for maintenance and repairs if needed.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Part of the request was to be able easily place the stage tank in new positions as required.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The easiest way to do this, was to build a sled on which it can be pulled.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Due to the size of the sled, it was assembled and welled in 2 halves.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Once welded they were joined together and,

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

The container was placed on top of the sled and welded in position.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

A water test showed some leaks, which was quickly repaired.

Considering it was a grade B container there was very little water lost.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06
VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

We applied a water resistance primer to the inside on the tank.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Nice inside paint job!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Same water-resistant primer was applied on the outside.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Final paint applied to make the staged tank look brand new.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Loaded and on its way to its destination in Botswana. The tank worked so well that they ordered another on 3 months later.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

N12 VERMEULENS Exterior Modernization

N12 VERMEULENS Exterior Modernization

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

CONTACT US;

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Vermeulens New Development – Wi-Fi Tower Installation

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

Details about this Project;

THE PROBLEM AND CLIENT’S REQUEST:

We were request by VERMEULENS and TRAMWAY / JENNEY INTERNET to install a WIFI tower on the new site.

Constraints that were facing us getting the right position and hight to be able to receive a strong signal. Problem is the best position was right in the path of the roadway for the delivery vehicles, we had to improvise to achieve the same result.

THE SOLUTION:

Decision was made to fix the WIFI tower to the side of the building out of the path of the delivery vehicles and in the best position possible.

 

 

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 01

Fixing the first tower section and bracket to the side of the building.

We needed to clear the sheeting.

Nobody wants to fix sheeting!!!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

The brackets was welded to the outside column and anchored through the wall with treaded bar and back plates to ensure it will go nowhere.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 03

The securing of the first section took time, but it was worth it.

It is the base that holds everything else upright.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 02

Normally we install the tower sections with a jig, but due to the area and the complexity of the installation we decided it would be safer to use on of our cranes and assemble all the sections on the ground and lift it with on lift.

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 05

Tightening the last bolts!

VERMEULENS NEW DEVELOPMENT – WIFI TOWER INSTALLATION 06

Job done with quality. Job done safely! Happy client! We can ask for no more!

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

View some of our other projects completed by SOLHAR;

N12 VERMEULENS Exterior Modernization

N12 VERMEULENS Exterior Modernization

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

CONTACT US;

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

St. Patricks CBC in Kimberley – Classroom Floor Replacement

SOLHAR - Project Completed at CBC School in Kimberley (3)
SOLHAR - Project Completed at CBC School in Kimberley (3)

Details about this Project;

REASON FOR REPLACEMENT OF CLASSROOM FLOOR:

Water damage is protruding from underneath.

OUR SOLUTION/REPAIR APPROACH: 

  1. Remove the existing 100mm concrete floor.
  2. Replace with 25Mpa concrete floor containing
    • Fuge B : A pore blocking water proofer which binds with the lime in cement to form water repellent particles.
    • Fibrin XT : A monofilament polypropylene fibre, providing sufficient strength and contributes to water reduced permeability, making it strong, water proof and cost effective.
  3. Cut of expansion joint 24hr after placement.

TIP: How to fix a water damaged concrete floor?

Restoring Concrete After Water Damage – If you have wet concrete in your home or office, follow these steps for repair:


Remove standing water. The drying process for wet concrete begins with the removal of all standing water.

Dehumidify the space.

After removing the standing water, the next step is to dehumidify the space.

Create air movement.

SOLHAR - Project Completed at CBC School in Kimberley (4)
SOLHAR - Project Completed at CBC School in Kimberley (5)

We at Solhar Civils stive to incorporate new ideas into everyday challenges. We were privileged to be consulted by CBC school in Kimberley to assist in solving the manner of constant wet classroom floor.

Solhar Civils is extremely proud to assist in the upgrade of the infrastructure at CBC and continue to strive for developing relationships with the local business community.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

N12 VERMEULENS Exterior Modernization

N12 VERMEULENS Exterior Modernization

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

CONTACT US;

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Baobab Safety Tree Project

SOLHAR - Civil work - Jointshaft Truck Haul Road Project done by SOLHAR ENGINEERING (1)

Details about this Project;

THE CLIENT’S REQUEST:

The iconic baobab tree was chosen by our client as the symbol for the safety drive due to the characteristics of the tree. We were asked to design a tree our of metal sheets that would look as near as possible to the real tree which they would like to permanently place at the mine as symbol of the mine’s commitment to safety and the strength and presence of safety on the mine.

OUR SOLUTION:

The client selected the legendary baobab tree to represent their safety initiative, inspired by the tree’s unique qualities.

They requested that we create a metal sheet sculpture that closely resembles the authentic baobab, intending to install it permanently at the mine as a testament to their dedication to safety and the robust nature of their safety protocols.

 

Our challenge was to devise a design that not only appeared lifelike but, after welding and painting, would serve as a striking representation of this iconic tree.

The African baobab is remarkable not only because of its size, lifespan, fruit, and bark but also in the way it continually grows multiple fused stems. 

The bark regenerates in the space between these stems, called false cavities, which is unique to the baobab.

Solhar Energy Solutions and Engineering in Kimberley, LOGO Watermark
Our client is very happy with the new design and the time and quality we were able to achieve.
Our client is very happy with the new design and the time and quality we were able to achieve.

African baobab tree: how one plant creates an entire habitat

Essential for the ecosystem

Baobab trees are fundamental to the entire dry African savanna ecosystem. They help keep soil conditions humid, aid nutrient recycling, and slow soil erosion with their massive root systems.

In an arid climate, baobabs symbolize life in a landscape where little else can thrive. Its large whitish flowers open at night and fall within 24 hours, creating a beautiful display at both ends of the cycle.

As a succulent, the tree absorbs and stores water from the rainy season in its massive trunk, producing a nutrient-dense fruit in the dry season, which can grow up to a foot long. The fruit contains tartaric acid and Vitamin C, serving as a vital nutrient and food source for many species.

They are also an essential source of water and shelter for hundreds of animals, including birds, lizards, monkeys, and even elephants – which can eat their bark for moisture when there is no water nearby. Bats pollinate the flowers, feeding on their nectar.

 

Children swim in lake near Baobab Alley in Morondava, Madagascar. Photo ID 185814815 © Ekaterina Tsvetkova | Dreamstime.com

 Children swim in lake near Baobab Alley in Morondava, Madagascar. Photo ID 185814815 © Ekaterina Tsvetkova | Dreamstime.com

The African baobab is remarkable not only because of its size, lifespan, fruit, and bark but also in the way it continually grows multiple fused stems. The bark regenerates in the space between these stems, called false cavities, which is unique to the baobab.

In human culture

For humans, the baobab’s fruit pulp can be eaten, soaked in water to make a refreshing drink, preserved into a jam, or roasted and ground to make a coffee-like substance. The bark can be pounded to make everything from rope, mats, and baskets to paper and cloth. Leaves are also used, they can be boiled and eaten, or glue can be made from their flower’s pollen.

Throughout the Zambezi, Indigenous communities note the baobab for its branches that seem to span out in all directions like roots. Local legend says the baobabs were too proud, so the gods became angry and uprooted them and threw them back into the ground upside-down.

Withstanding climate change

Indigenous peoples have learned, through centuries, to live harmoniously with these majestic trees, thriving off of their many uses without depleting them. However, due to climate change, nine of thirteen of Africa’s oldest and largest baobab trees have died in the past decade. Scientists speculate that warming temperatures have killed the trees directly or made them weaker and more susceptible to drought, diseases, fire, or wind.

Only with the integration of ecological, social, and economic studies involving local communities can we restore Africa’s climate and ecosystem over the long term and ensure that the baobab tree will continue to live and thrive for thousands of years to come.

Interested in learning more about the bioregions of Afrotropics? Use One Earth’s interactive Navigator to explore bioregions around the world.

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

N12 VERMEULENS Exterior Modernization

N12 VERMEULENS Exterior Modernization

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

CONTACT US;

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

We are known for our commitment to sustainability and innovation, using the latest technologies and techniques to ensure that our projects are not only functional, but also environmentally friendly and efficient.
Solhar Energy Solutions and Engineering in Kimberley, LOGO

Noord-Kaap Bull Run – Plat Hond

SOLHAR - Civil work - Jointshaft Truck Haul Road Project done by SOLHAR ENGINEERING (1)

Noord-Kaap Bull run, als wat jy wil weet, Kliek en lees hier!

Ons is lief om deel te wees van gebeurtenisse in die Noordkaap.

 Alex Voster van Ekapa het vir ons vrywill gegee om bietjie sy kar “Plathond “ toe te rus.

Hier is die eind resultaat:

Our client is very happy with the new design and the time and quality we were able to achieve.
Our client is very happy with the new design and the time and quality we were able to achieve.
Solhar Energy Solutions and Engineering in Kimberley, LOGO Watermark

GALLERY of images – Bull Run – Plat Hond Refurbishment Project, done by SOLHAR

Solhar Energy Solutions and Engineering in Kimberley and Botswana - LOGO

Collection of projects done by the SOLHAR Team

SOLHAR Energy Solutions and Engineering in Kimberley and Botswana

N12 VERMEULENS Exterior Modernization

N12 VERMEULENS Exterior Modernization

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (July to December 2024)

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

SOLHAR’s Ready Mix Concrete – VERMEULENS Brand New N12 Business Park Development

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

KEW FOUNDRIES Supplier performance evaluation for the period (January to June 2024)

Dozer Blade Project – Removable Wear Liner  – Idwala Lime

Dozer Blade Project – Removable Wear Liner – Idwala Lime

SOLHAR Botswana – Water Storage and Pump – Stage Tank

SOLHAR Botswana – Water Storage and Pump – Stage Tank

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

Vermeulens in Kimberley’s New Development – Wi-Fi Tower Installation

St Patrick’s CBC, Classroom Floor Replacement

St Patrick’s CBC, Classroom Floor Replacement

Baobab Safety Tree done by SOLHAR

Baobab Safety Tree done by SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

Noord-Kaap Bull Run 2024 – Alex Voster van Ekapa se kar “Plathond “ toegerus deur SOLHAR

775 Lvl Crusher Chute

775 Lvl Crusher Chute

Riverton Clarifier Refurbishment Project

Riverton Clarifier Refurbishment Project

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

463 Bucket Refurbishment Project done with GHAAP and SOLHAR in July of 2024

Jointshaft Truck Haul Road – SOLHAR Civils Project

Jointshaft Truck Haul Road – SOLHAR Civils Project

Kimberley Water Shutdown – 13 Nov 2015

Kimberley Water Shutdown – 13 Nov 2015

ESKOM Building Project – Done by SOLHAR

ESKOM Building Project – Done by SOLHAR

Botswana Silos Project – GALLERY

Botswana Silos Project – GALLERY

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

STOCKPILE CRUSHER – Project done by SOLHAR in Kimberley

WINGWALLS done by SOLHAR

WINGWALLS done by SOLHAR

PCCU PROJECT

PCCU PROJECT

Solhar Energy Solutions and Engineering in Kimberley, LOGO

Our Kimberley Branch is situated at 8 Hendrik van der Bijl, Kimdustria, Kimberley, 8301, Northern Cape, South Africa

Solhar Energy Solutions & Engineering Contacts: 

GERRARD BOOYENS
082 551 4082
gerrard.booyens@solhar.co.za

KEVIN HARDING - Ready-Mix
083 256 9975
kevin.harding@solhar.co.za

BRIAN DANIELS
082 481 0616
brian.daniels@solhar.co.za

Solhar Energy Solutions & Engineering Botswana Contact:

ROY DE BRUIN 
+26771660127
roy.debruin@solhar.co.za

CONTACT US;

Brave men are not born! They are molded. SOLHAR constantly thrive to achieve the set goals monthly and we maintain our identity in what we stand for. If we do not stand for something we might fall for anything. May GOD always stay our protector in whatever project we complete, big or small. To HIM alone the glory and honor - Hallelujah

 

- Kevin Harding

Men tend to lose their identity in these trying times. We are identified as hard working men taking ownership and responsibility as good, loyal GOD fearing men for our households! BE THE MAN everyone talks about. Stand out in the crowd. Believe and NEVER forget your role and responsibility.

- Kevin Harding

Deliver service. Something we tend to be dislodged from in society in having a basic right to services rendered around us. If GOD stops to deliver the sun, moon, and stars on time we are done with and therefore we strive to keep our focus on delivery of service to our customers.

- Kevin Harding